View Single Post
Old 05-21-2007, 07:17 PM   #7
icereefer
Member
 
Join Date: May 2007
Posts: 20
icereefer is on a distinguished road
Default

once I drilled my holes I ran my piece threw my table saw to get the size I needed then I rounded the ends with my disc sander.

then I add triangle braces to the end and the finished product.
.
this shot is the bracket installed.

Next I'm running a calcium reactor so I needed to make a effluent box so I can monitor my effluent thats going into my sump.
here a photo of my box installed I just need to drill my top for my prob to fit in.
icereefer is offline   Reply With Quote