once I drilled my holes I ran my piece threw my table saw to get the size I needed then I rounded the ends with my disc sander.
![](http://i33.photobucket.com/albums/d92/Jim-Durso-/Sumpfor75gal039.jpg)
then I add triangle braces to the end and the finished product.
![](http://i33.photobucket.com/albums/d92/Jim-Durso-/Sumpfor75gal040.jpg)
.
this shot is the bracket installed.
![](http://i33.photobucket.com/albums/d92/Jim-Durso-/Sumpfor75gal044.jpg)
Next I'm running a calcium reactor so I needed to make a effluent box so I can monitor my effluent thats going into my sump.
here a photo of my box installed I just need to drill my top for my prob to fit in.
![](http://i33.photobucket.com/albums/d92/Jim-Durso-/Sumpfor75gal045.jpg)